Contact us   Home   繁體   簡中  
 
 
 
 
 
 
System / Module Reliability Engineering Test
Material Test for Automotive
Climatic Environmental Test
Dynamic Environmental Test
Industries/Outdoor Environmental Test
Mechanical Stress Test
Design Verification
Lead Free Qualification
Component Reliability Test
Board Level Reliability Test
Other Test
 
 
 



Component Pre-condition
 

Component preconditioning is based on JESD22-A113 Preconditioning of Nonhermetic Surface Mount Devices Prior to Reliability Testing and testing is based on J-STD-020 Moisture/Reflow Sensitivity Classification for Nonhermetic Solid State Surface Mount Devices.

The purpose of this test is to establish a preconditioning process of SMT components to simulate the multiple reflow operations encountered in typical assembly operations. The preconditioning procedure must be performed prior to a specific reliability test, with a proper order of conditioning selected based on the product.

The preconditioning procedure:

precondition、JESD22、J-STD-020
蘇先生/Lingsing
+886-3-5799909#6402
web_CRE@istgroup.com
Please contact nearest location for inquiries :
USA Taiwan ─ Hsinchu China ─ Shanghai Kunshan Beijing Shenzhen Japan
Other services you may be interested in:
 
Thermal Shock Test (Gas / Liquid)
Moisture Sensitivity Level Test
Highly Accelerated Stress Analysis(HASS)
 


 
Lab Service:    Taiwan      |       China      |        USA       |       Japan     |       TWN ITS     |       Partnerships
Designed by CREATOP